Project Type:
Project Location:
Project Description:
The homeowners contacted us because their roof was still leaking after a repair by another contractor. We found weaknesses around the cast pipe and along the bottom of the dormer. We replaced the entire section of the roof with both ice and water membrane and GAF HDZ Shingles; leaving a proper tie-in between the new roof and the section that was not replaced.
Before Project:
After Project: